Post tensioning Slab Load Testing

A building under construction experienced cracks on its post-tensioned slab. The structural capacity was questionable for a designed live load of 400 kg/m2 and a super imposed dead load of 250 kg/m2. Thus, a load test was conducted to determine the actual floor capacity.