Structural Health Assessment of Waste Water Treatment Plant

Structural Health Assessment in waste water treatment plant

Structural Asessment

RE investigated the structural health condition of a waste water treatment plant in Samut Prakarn, Thailand. First, the Visual Inspection Test was conducted to determine any signs of damage in the forms of cracks, deterioration, deformation and structural discontinuity. Then, the Rebound Hammer Test (in compliance with the ASTM C805 standard) was used to determine the compressive strength of concrete. Finally, the settlement survey was conducted to investigate the structural settlement.